Saturday, September 21, 2024

Baghdad

Ninewa streets paved at over $3m.

NINEWA / IraqiNews.com: Several streets in Ninewa’s al-Hamdaniya district have been paved at a total cost of nearly $3.4 million U.S. dollars, according to a local source. “The project was conducted as part of the 2008 development plan,” Engineer Saad Bahnam told IraqiNews.com. Al-Hamdaniya district is 30 km east of Mosul, the capital city of Ninewa province, which lies 405 km north of Baghdad. SS (P) 1