Wednesday, September 25, 2024

Baghdad

ID88m to rehabilitate sewage systems in Ninewa

BAGHDAD / IraqiNews.com: The Ninewa Sewage Directorate has started a campaign to rehabilitate sewage systems in the province at a total cost of ID88 million, in preparation for the winter season. “The campaign is conducted by the Directorate’s staff and equipments,” Nashwan Ibrahim, from the Directorate’s relations and media department, told IraqiNews.com news agency. He said that this campaign is annual, to prepare the Ninewa sewage systems for the rainy season during winter. Mosul, the capital city of Ninewa province, lies 405 km north of Baghdad. MH (P)/SR 1